Production of Boeing 787 Dreamliners resumed at the end of January with the join of the fifth airplane designated for flight test. Designated ZA005, this fifth airframe is the first to be powered with General Electric GEnx engines with the previous four using Rolls-Royce engines. “This airplane signifies our return to a steady production rhythm,” said Jack Jones, vice president of 787 Final Assembly and Change Incorporation.
Leaderboard
Related Articles
AIR ONE International Holdings expands twin-engine freighter fleet as Boeing delivers second 777F in 3 months
Asia Pacific aviation leaders chart growth strategy at 69th AAPA Assembly of Presidents
Boeing Distribution launches unified e-commerce platform
Korean Air and Boeing to strengthen predictive maintenance collaboration
AIR ONE International Holdings takes delivery of first new Boeing 777 freighter, with second aircraft due by the end of the year
Korean Air to purchase 103 Boeing aircraft plus GE engines totaling KRW 70 trillion


